![]() |
|||||
Commercial Charges |
|||||
| Item | Description | Price | Unit | ||
| scdw | Commercial Drywall Step Charge
$2.00 per flight or $4.00 per floor per sheet |
$ 2.00 | sheet / flight | ||
| scm | Commercial Steel Step Charge
$1.00 per flight or $2.00 per floor per bundle |
$ 1.00 | bundle / flight | ||
| scg | Commercial Grid Step Charge
$2.00 per carton per floor |
$ 2.00 | carton / floor | ||
| sct | Commercial Tile Step Charge
$2.00 per carton per floor |
$ 2.00 | carton / floor | ||
| ecdw | Interior Elevator Charge Drywall
$2.00 per sheet for stand up situation |
$ 2.00 | sheet | ||
| ecm | Interior Elevator Charge Steel
$1.00 per bundle for stand up situation No charge for roll on |
$ 1.00 | bundle | ||
| ecat | Interior Elevator Charge Tile
No charge at all |
$ . | carton | ||
| eccg | Interior Elevator Charge Grid
$1.00 per bundle for stand up situation No charge for roll on |
$ 1.00 | carton / floor | ||
| hcdw | Drywall Hoist Charge | $ 10.00 | msf | ||
| hcm | Steel Hoist Charge | $ 10.00 | mlf | ||
Notes |
|||||
| • | A flight of steps is defined as a stairway set of steps between 1 floor or landing
and the next flight of steps. On many jobs, there are two flights per floor. |
||||
| • | No stocking charges apply for interior elevators where we can roll a completely
loaded cart of material onto the elevator. |
||||
| • | Any material that can not be rolled into a Hoist on a cart, but needs to be stood
up, will carry the same charges as if it was to be stocked into an Interior Elevator. |
||||
| |
|||||
Residential Charges |
|||||
| scdw | Residential Drywall Step Charge
$2.00 per flight |
$ 2.00 | sheet / flight | ||
| loft | Hand Drywall To Loft Charge | $ 2.00 | sheet | ||
| hd | Hand Drywall Down To Basement Charge | $ 2.00 | sheet | ||
| wab | Walk Around Basement
This charge is for walking board around the outside of a house into a walkout basement. |
$ 2.00 | sheet | ||
| basement | Walk Board Down Steps Into Basement
$2.00 per flight |
$ 2.00 | sheet | ||
| |
|||||
Material Returns, Unstocking Jobs |
|||||
| Material Returns | |||||
| restock | 15% for all material returned to yard by customer
30% for all material picked up at a job site curbside |
15% 30% |
|||
| restock | 30% + $150.00 per hour (2-3 man crew) to unstock material from job. 1 hour min. | ||||
| labor | There will be an additional charge of $50.00 per hour for each additional man needed over 3. | ||||
No credit issued for non-stocked material |
|||||
| Moving material on job site
This is for material already onsite that a customer asks to be moved onsite |
|||||
| labor | $2.00 per sheet for all drywall (there will be no material credit)
$ .50 per bucket for all joint compound (there will be no material credit) $1.00 per box of ceiling tile, bundle of insulation, bundle of 20ga or 25ga metal $ .50 per piece of 18ga or heavier metal that does not come bundled together (Additional fees will apply per CBSI schedule if walked up or down steps, in an elevator or handed up or down.) |
||||
Small Deliveries |
|||||
| res-small | Residential Small Delivery
Any delivery to a residential job that is less than $250.00. No charge for tool and fastener deliveries. No charge for material B/O due to being Capitol's fault. |
$ 25.00 | |||
| com-small | Commercial Small Delivery
Any delivery to a commercial job that is less than $1,000.00. No charge for tool and fastener deliveries. No charge for material B/O due to being Capitol's fault. |
$ 50.00 | |||
Crane Service |
|||||
| crane | Cost of Crane, + 5% administrative fee on all cranes | ||||
| flagman | Flaggers, $50.00 per hour for flagger required | ||||
| tc | Customer pays cost of all permits and traffic control | ||||
Boom Other Material on Job Sites |
|||||
| labor | $250.00 per hour for operator and boom truck, 2 hour minimum
$50.00 per hour per man if labor needed to unload/deliver |
||||
Returned Delivery Charges |
|||||
| rd | $500.00 if boom delivery | ||||
| rdf | $250.00 if flatbed delivery
This is based on CBSI confirming delivery date and time with customer and CBSI living up to it's obligations on the order. |
||||
Early Morning, Late Evening, or Night Deliveries |
|||||
| CBSI will schedule deliveries from 5:00am until 6:00pm, Monday
through Friday, at no additional charge. |
|||||
| emf | Flatbed- customer requests a delivery time 4:30am or earlier. | $175.00 | per delivery | ||
| emb | Boom- customer requests a delivery time 4:30am or earlier. | $250.00 | per delivery | ||
| nf | Flatbed- customer requests a delivery time 6:30pm or later. | $175.00 | per delivery | ||
| nb | Boom- customer requests a delivery time 6:30pm or later. | $250.00 | per delivery | ||
Sunday Delivery Charges |
|||||
| sc | Boom Delivery or Crane Job | $750.00 minimum no exceptions. | |||
| scf | Flatbed Delivery | $250.00 minimum no exceptions. | |||
| *crane charges, traffic control, permitting, and flagman charges will be charge separately | |||||
